Mark 1 cabin refit ...

Detailed posts on modifications and projects.
Post Reply
luigisante
Posts: 319
Joined: Wed Jul 08, 2009 1:19 pm
Contact:

Mark 1 cabin refit ...

Post by luigisante »

Progress. The Electrical Panel backer, cut from plywood


Electrical Panel.jpg (8.38 KiB) Viewed 548 times


and covered with vinyl.


Electrical Panel2.jpg (2.47 KiB) Viewed 548 times


Forward electric bilge pump is installed.


Bilge Electric.jpg (5.81 KiB) Viewed 548 times

luigisante
Posts: 319
Joined: Wed Jul 08, 2009 1:19 pm
Contact:

Mark 1 cabin refit ...

Post by luigisante »

Covered the port window side interior with vinyl to match the electrical panel backer.


Panel Fitted.jpg (4.38 KiB) Viewed 539 times


Before fitting the panel, I made a cover for the bracket bolts.


Bracket Bolt Cover.jpg (5.18 KiB) Viewed 539 times


The Cover will be painted white once the screw holes are filled and the seams puttied. The cover will be screwed into a top bracket screwed and glued onto the coachroof.


Electric Panel Bracket.jpg (3.94 KiB) Viewed 539 times


I also cut out a wooden bottom for the backer and will be fastening the backer to it for installation. Once the backer is installed, I'm ready to start working on the port bunks. This should be interesting. Hopefully, I can keep up this pace.

Lou
luigisante
Posts: 319
Joined: Wed Jul 08, 2009 1:19 pm
Contact:

Mark 1 cabin refit ...

Post by luigisante »

Here's a rough sketch of the plan for the upper port bunk. The lower one will be a fixed settee bottom with a cushion.


bedplan.jpg (16.08 KiB) Viewed 525 times



Lou
luigisante
Posts: 319
Joined: Wed Jul 08, 2009 1:19 pm
Contact:

Mark 1 cabin refit ...

Post by luigisante »

Finished up the electrical panel. It looks nice. Fitted the first support for the Ceiling. I'm considering Oak Lattice Ribs on the Ceiling rather than plastic. There's plenty of fastening strength.

Here is the base of the electrical panel being fitted.


Panel Fitted.jpg (12.48 KiB) Viewed 513 times


It was cleated and the bottom was covered in vinyl.


Vinyl Covered.jpg (14.59 KiB) Viewed 513 times


The vinyl was reglued and refitted over the plywood before being fitted with a mounting cleat for accepting screws set through the locker wall.


Cleated.jpg (16.55 KiB) Viewed 513 times

luigisante
Posts: 319
Joined: Wed Jul 08, 2009 1:19 pm
Contact:

Mark 1 cabin refit ...

Post by luigisante »

Cont ...

Here is the base fastened in place. The block you see was temporary and removed as soon as the base was completely fastened.


Tight Fit.jpg (9.28 KiB) Viewed 506 times


And the finished corner. The whole corner is really strong.


Clean Corner.jpg (14.24 KiB) Viewed 506 times


I like the idea of using Lattice for the cieling but I think I'll go with Oak rather than plastic. Not crazy about the plastic.


Ceiling Lattice.jpg (14.06 KiB) Viewed 506 times


Next step ... cut the settees.
Last edited by luigisante on Sun Jun 12, 2011 6:31 am, edited 1 time in total.
Reason: